Deciding to order a HIDULAR capsule house is an exciting step toward enhancing your living space, whether it’s for a guest house, remote office, or a unique vacation rental. However, before you place your order, there are several key factors to consider and plan for to ensure a smooth process from start to finish. Here’s what you need to know and prepare for before placing your order.

1. Manufacturing Timeline: 4-6 Weeks

When you order a HIDULAR capsule house, you're getting a brand new, made-to-order home built to United States specifications. The manufacturing process typically takes between 4 to 6 weeks. During this time, it’s important to plan for other aspects of the project, such as site preparation and logistics, to ensure everything is ready for when your capsule house arrives.

2. Shipping: 2-5 Weeks

After manufacturing is complete, HIDULAR takes care of shipping your capsule house to the nearest port, which generally takes between 2 to 5 weeks depending on your location. By handling the shipping, we give you more time to focus on preparing your site and coordinating other essential tasks, ensuring a smoother overall process.

3. Site Preparation

Before you place your order, it's crucial to ensure that your site is ready to accommodate the capsule house. Key considerations include:

  • Permitting: Check with your local building department to confirm that your capsule house is permitted in your area. Obtaining the necessary permits before placing your order will help avoid any delays or legal issues.
  • Foundation and Ground Preparation: Although a full concrete slab is not necessary since HIDULAR capsule houses come with built-in footings, you must ensure that the ground is solid and level. The footings are adjustable, making them suitable for various land grades.
  • Utilities: If public water and sewer services are not available at your site, you will need to consider installing holding tanks (not included). Make sure to arrange for electricity, water, and sewer hookups to be in place before your capsule house arrives.
  • Public Water and Sewer Alternatives: If your site lacks access to public water and sewer services, consider installing holding tanks or alternative systems. These are not included with the capsule house, so be sure to consult with a local contractor to explore your options.
  • Installation Services in Hawaii: If you’re located in Hawaii, HIDULAR offers installation services to help you set up your capsule house. Contact us for a free estimate to ensure your project goes smoothly.

4. Pickup, Transportation, and Placement

Once your capsule house arrives at the nearest port, you’ll need to arrange for its pickup and transportation to your site. Our capsule houses range in weight from 3.5 to 10 tons, depending on the model, so they must be delivered on a heavy-duty truck with a 40' flat rack and positioned with a crane. The truck and trailer require a clear path at least 12 feet wide and relatively straight from a paved road, as they cannot make tight turns—similar to maneuvering a boat trailer or camper.

It’s crucial to ensure that there are no obstacles along the path, such as fences, trees, branches, or underground septic systems, that cannot be navigated around. Placement of the capsule house can be handled with a crane that has sufficient lifting capacity. The capsule houses come equipped with lugs for crane lifting, making it easier to move and position them precisely on the foundation. Proper planning and careful coordination are essential to ensure your capsule house is safely and correctly positioned.

6. Installation

The final installation step involves connecting your capsule house to utilities and completing any additional work needed to make it move-in ready. This includes tasks like connecting to the grid and setting up interior features. Additionally, stairs will need to be constructed and installed, as these are not included with the capsule house due to the varying land elevations and site-specific requirements.

Final Thoughts

Ordering a HIDULAR capsule house is a significant investment in your property’s future. By taking the time to plan for these key aspects before placing your order, you’ll ensure a smoother process and a successful installation. For more detailed information and assistance, please refer to hidular.com or contact us directly to discuss your project needs.

TL;DR

Too Long; Didn't Read

Before ordering a HIDULAR capsule house, plan for key aspects like the 4-6 week manufacturing timeline and the 2-5 week shipping process, which HIDULAR handles. Ensure your site is prepared, including permits, solid ground, utilities, and possibly holding tanks if public water and sewer are unavailable. You’ll also need to arrange for transportation from the port, crane services for placement, and the construction of stairs. HIDULAR offers installation services in Hawaii—contact us for a free estimate to streamline your project.